Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-23 Revision Date: 4/9/25 <br /> Revision No.: MR-261 <br /> <br />In those areas where topsoil is stripped and hauled directly back to contoured backfill, some of the <br />established native species can be expected to occur in the revegetated area. <br /> <br />Stockpiled topsoil will not be moved when required for redistribution on disturbed areas prior to <br />seeding. An exception to this can occur to facilitate mining, construction of sediment control <br />ditches, ponds, etc. Approval from the Division will occur prior to moving stockpiled topsoil for <br />purposes other than seedbed preparation. <br /> <br />All topsoil stockpiles should be protected with a ditch and berm around their perimeter to conserve <br />the resource. <br /> <br />4.06.4 Redistribution <br /> <br />After the final grading is completed, the topsoil will be reapplied as shown on the disturbed land <br />areas shown on the Topsoil Handling Map (Map 28 and 28A). Please see section 2.05.4 for topsoil <br />redistribution depth replacement. <br /> <br />Where necessary, to prevent slippage surfaces and promote root penetration the spoil will be <br />scarified by ripping and/or rough grading. This practice will assure a solid bond between the spoil <br />and reapplied topsoil. To date, there is no evidence of topsoil slippage on reclaimed areas. A few <br />small tension cracks resulting from settling of fill and topsoil have occurred in a few areas within <br />a year or two after reclamation, but soon stabilize and begin to fill in. <br /> <br />Since all available topsoil existing on areas to be disturbed will be removed and reapplied, it will <br />be fully capable of supporting growth necessary for the proposed post-mining land use. <br />Compaction will be alleviated through chisel plowing. The method of topsoil replacement most <br />often used at Colowyo, which makes use of dozers, leaves the surface in a rough condition which <br />minimizes wind and water erosion. The use of a chisel plow following topsoil replacement and the <br />construction of contour furrows at the time of seeding or before will also aid in erosion control. <br /> <br />4.06.5 Reconditioning <br /> <br />Topsoil quality at Colowyo is excellent in terms of providing a suitable plant growth medium <br />capable of supporting the approved post-mining land use and the revegetation requirements of <br />Section 4.15. Soil testing has not indicated any deficiencies. Refer to Volume 3, Exhibit 10, <br />Establishment of Native Shrubs on Disturbed Lands in the Mountain Shrub Vegetation Type. This <br />study was conducted on the Colowyo Mine July 1975 through December 1979. Colowyo has the <br />option to apply 50-70 pounds of phosphorus per acre to all safely accessible reclaimed mine areas <br />prior to chiseling and seeding. <br />