My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (94)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (94)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:38 AM
Creation date
6/24/2025 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 11
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ewmont,,. FIPPLE CREEK & VICTOR <br /> PO Box 191 <br /> 100 N.CRIPPLE CREEK&VICTOR rtlS0 <br /> Victor COC 8086860 <br /> 9.9. Delivery to Laboratory <br /> Planning is required to ship the samples so the lab personnel are available to <br /> receive them, especially if shipping over the weekend. If a rush analysis is <br /> requested, notify the laboratory ahead of time. To ship samples, fill outa shipping <br /> paper for each cooler (see Appendix C) and deliver the coolers and shipping <br /> papers to the shipper. Make a copy of the shipping paper, COC and file in the Chain <br /> of Custody folder (see Tracking System section below). Note: For water quality <br /> samples there must be enough ice in the cooler to ensure the sample temperature <br /> is maintained at _<4°±2°C. <br /> 9.10. Data Analysis <br /> Analysis reports are received with the invoices. The data should be checked <br /> relative to the requirements of Newmont's permits, fluid management plans, <br /> MCL's, and for any unusual results or possible trends which may be developing. <br /> • The coordinator should be informed of any abnormalities. <br /> 10. WELL SAMPLING EQUIPMENT <br /> If possible, dedicated sampling devices should be used in water quality <br /> monitoring. When non-dedicated equipment is used, equipment will <br /> decontaminated using the procedures detailed above, before and after use to <br /> avoid cross contamination of wells. Equipment should be used according to <br /> manufacturers' guidelines. A brief summary of guidelines for various types of <br /> equipment used by CC&V follows: <br /> 10.1. Dedicated Electric Powered Sampling Pump <br /> When possible, use the dedicated electric powered sampling pump to purge <br /> sampling wells. If the electrical connection coming from the dedicated sampling <br /> pump is a 240 volt connection, connect directly to the 240 volt input on the <br /> generator. If a four prong electrical connection comes from the dedicated <br /> sampling pump, connect the four prong connection from the sampling pump to <br /> the four prong connection on the control box. Then connect the 240 volt <br /> connection on the flow control box with the 240 volt input on the generator. Once <br /> • the electrical connections are made pull out the choke on the generator, ensure <br /> the gas valve is open and start the generator. Once the generator is started push <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: <br /> SER Date of This Issue--/--/-- Date of Next Review:--/--/-- Page 28 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.