Laserfiche WebLink
• SSR <br /> MINING <br /> • Soil Liner Fill <br /> • Drain Cover Fill <br /> o Geomembrane Construction Quality Assurance <br /> • Geomembrane Third Party Conformance Testing <br /> • Geomembrane Panel Deployment <br /> • Geomembrane Fusion Seaming <br /> • Geomembrane Extrusion Seaming <br /> • Geomembrane Destructive Testing <br /> • Geomembrane Pressure Testing <br /> • Geomembrane Defects and Repairs <br /> • Geomembrane Acceptance <br /> • PROJECT DEVIATIONS <br /> • ENGINEER'S OPINION stamp <br /> ISSUED FOR CONSTRUCTION DRAWINGS <br /> • COVER SHEET stamp <br /> • • PROJECT SITE PLAN VIEW stamp <br /> • EXISTING SITE CONDITIONS stamp <br /> • GRADING PLAN stamp <br /> • GRADING PLAN ISOPACH stamp <br /> • LINER LIMITS stamp <br /> • VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET stamp <br /> • UNDERDRAIN DETAIL SHEET stamp* <br /> • LEAK DETECTION & EROSION CONTROL DETAILS stamp* <br /> • SOLUTION CONCENTRATION PIPING LAYOUT stamp <br /> • SOLUTION COLLECTION SYSTEM DETAILS stamp <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> • TOP OF SOIL LINER FILL AS-BUILT stamp <br /> • UNDERDRAIN AS-BUILT stamp* <br /> • SOLUTION COLLECTION SYSTEM AS-BUILT stamp* <br /> • LEAK DETECTION TRENCH AS-BUILT stamp* <br /> • GEOMEMBRANE PANEL LAYOUT AS-BUILT stamP <br /> • DRAIN COVER FILL AS-BUILT ISOPACH stamp <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 21 <br />