• <br /> • SSR <br /> MINING <br /> 13 QUALITY ASSURANCE AND QUALITY CONTROL(QA/QC) <br /> As the construction schedule is established, VLF2 Phase 4 and VLF1 Phase 6 QA/QC data will <br /> be submitted to the DRMS either in its entirety, or in phases, consistent with prior submittals. <br /> CC&V will receive the DRMS' acceptance of the QA/QC data prior to ore placement and leaching <br /> ore placed on any portion of the expanded facilities. <br /> To meet the requirements of section 7.3 of the Rules, all VLF Construction Quality Assurance <br /> Reports (CQA) will be limited to the following sections; <br /> • INTRODUCTION <br /> o Project Description <br /> o Parties Involved <br /> o Construction Quality Assurance/Construction Quality Control <br /> o Design Drawings and Technical Specifications <br /> o Use of this Report <br /> • VLF CONSTRUCTION ACTIVITIES <br /> o Clearing and Grubbing <br /> • 0 Underdrains* <br /> O Closure Drain* <br /> O Site Grading <br /> O Subgrade Preparation <br /> O Leak Detection Trench* <br /> O Soil Liner Fill <br /> O Pregnant Solution Storage Area (PSSA) Composite Liner System* <br /> O Geomembrane <br /> O Solution Collection System) Piping* <br /> O Solution Collection System Riser Foundation* <br /> O Drain Cover Fill <br /> • QUALITY ASSURANCE/QUALITY CONTROL <br /> O Testing Standards <br /> • Earthworks Testing Standards <br /> • Geomembrane Testing Standards <br /> O Earthworks Construction Quality Assurance <br /> • Underdrain Fill* <br /> • Select Structural Fill <br /> • Structural Fill <br /> • Leak Detection Fill* <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 20 <br />