Laserfiche WebLink
• <br /> • SSR <br /> MINING <br /> Table U-2- Environmental Protection Facilities <br /> Facility Designated Sampling Frequency Release <br /> Chemicals/Acid Mine Response <br /> Drainage Procedures <br /> VLF1 (Liner and Toe Sodium Cyanide, Dilute Weekly inspections of the Outlined in <br /> Berms) Sodium Cyanide Solution, Leak Detection System, ERP <br /> Sodium Hydroxide, Hypochloric Quarterly sampling of down- <br /> Acid gradient monitoring wells <br /> ADR1 Sodium Cyanide, Dilute Weekly inspections of the Outlined in <br /> Sodium Cyanide Solution, Leak Detection System, ERP <br /> Sodium Hydroxide, Hypochloric <br /> Acid Quarterly sampling of down- <br /> gradient monitoring wells <br /> • VLF1 Possible Sodium Cyanide, Weekly inspections. Outlined in <br /> Underdrain/Pumpback Dilute Sodium Cyanide Sampled if flow is observed ERP <br /> System Solution,Sodium Hydroxide, in underdrain <br /> Hypochloric Acid <br /> Enrichment Building& Sodium Cyanide, Dilute Weekly inspections of the Outlined in <br /> Assay Laboratory Sodium Cyanide Solution, Leak Detection System, ERP <br /> Sodium Hydroxide, Hypochloric <br /> Acid Quarterly sampling of down- <br /> gradient monitoring wells <br /> Off-liner Process Dilute Sodium Cyanide Weekly inspections of the Outlined in <br /> Pipelines Solution Leak Detection System, ERP <br /> Quarterly sampling of down- <br /> gradient monitoring wells <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 10 <br />