Laserfiche WebLink
Docusign Envelope ID:45B9721 C-FDE2-4821-B686-80BBC79CA6DD <br /> 15. Within Section 2.7.1, Surface Mine Backfill Areas, Paragraphs 7 and 8 contain conflicting <br /> statements regarding the backfilled East Cresson WHEX. One states the backfill will <br /> • promote free drainage of stormwater to the surrounding surface whereas the other <br /> paragraph states that per TR96 the backfill will result in stormwater flowing back into the <br /> pit. Please revise the Paragraph 7 text. <br /> Comment acknowledged. Section 2.7.1 has been revised to reflect that as per TR96, backfilling of <br /> WHEX will result in stormwater flowing back into WHEX, away from Grassy Valley. <br /> 16. Due to the constructed outside slopes of VLF1,the reclamation plan and cost estimate has <br /> major tasks (please refer to CIRCES Tasks A2000 to A2011) of moving material to achieve <br /> the approved post-mining slope grade. Please demonstrate that once VLF1 Phase 6 is fully <br /> built out there is still available space within the original crusher pocket area to place the <br /> approximate 25 million cubic yards of cut material. <br /> The configuration for AM-14 has demonstrated a greater capacity than initially verified. Upon full <br /> completion of VLF1, Phase 6, a total capacity of 127,448 million cubic yards will be available which is <br /> more than sufficient to accommodate the approximate 25 million cubic yards of cut material. <br /> Exhibit F—Reclamation Plan Map (Rule 6.4.6): <br /> 17. As Reclamation Plan Maps F-2 through F-8 provide increased detail,the Division request <br /> either Map F-1 be revised or a Map F-la be provided with the shading and cross hatching <br /> removed to allow for clear review of the proposed post mining contour lines. <br /> The Reclamation Plan Maps have been modified for clarity and are provided in Attachment 4. Shading <br /> and cross hatching has been removed from Map F-1 to allow for easier review of the proposed posed <br /> mining contour lines. <br /> • 18. The following items need to be addressed on one or more of the Exhibit F Reclamation <br /> Plan Maps: <br /> a. Please review and correct various contour lines errors (e.g. intersecting and <br /> termination of lines in the North Cresson Mine area). <br /> The Exhibit F Reclamation Plan Maps have been revised and are included in (Attachment 4). <br /> b. Contour elevation labels are missing on most of the Exhibit F Maps. Please revise the <br /> maps to show clear and abundant elevation labels. <br /> Revised maps with contour elevation labs are included in Attachment 4 The contour interval (35 feet) <br /> has been added to the legend. <br /> c. An Undisturbed Area (dark green shaded polygon) near the Mill Area is depicted, <br /> however AM14 expansion will incorporate some of this area. Please modify this <br /> Undisturbed Area accordingly. <br /> This area has been removed from the Exhibit F maps. <br /> d. It appears the posting-mining topography depicted pre-dates the AM14 VLF <br /> expansions. Please update the topography showing what the final reclaimed VLF1 and <br /> VLF2 surfaces will look like. <br /> Revised Exhibit F maps with updated topography are included in (Attachment 4). <br /> e. SThe South Cresson mine area backfill and accessible areas where growth media can <br /> • be placed per TR142 are not depicted correctly.Additionally, on F-6, the cross- <br /> SSR Mining Inc. PAGE 5/19 <br />