My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (96)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (96)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:37 AM
Creation date
6/24/2025 8:23:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:45B9721C-FDE2-4821-B686-80BBC79CA6DD <br /> 55. Drawing A015 depicts a spillway feature on the northern portion of the crest of the PSSS <br /> embankment. AM14 contains no details regarding this spillway. It appears that this <br /> • spillway will allow solution to drain to unlined areas if the PSSA capacity is exceeded, <br /> however, based on previous VLF designs, internal PSSAs have always drained to lined <br /> areas and into another PSSA in an exceedance scenario. Please explain why a spillway <br /> into VLF1 Phase 4 and VLF1 Phase 5 was not considered. Please also provide details in <br /> Section 4.4.1 of the report on the flow path of a 100% capacity exceedance of the VLF1 <br /> Phase 6 PSSA. <br /> The Spillway has been relocated to the VLF1 Phase 4 side slope. Additional discussion on the location <br /> of the spillway has been added to Section 4.4.1. <br /> 56. Please identify the location of the backfilled extents of the Elkton Pit on A016. Please also <br /> provide a demonstration the Leak Detection Trenches which pass over the backfill will <br /> maintain positive drainage towards the manhole(s)after maximum project settlement, <br /> otherwise, please discuss how the LDS will be constructed at a steeper grade in this area <br /> to account for the settlement. <br /> Elkton Pit has been removed from Amendment 14. The Leak Detection Trench will not be constructed <br /> on backfilled material. <br /> 57. Please remove the demolished facilities within the footprint of the VLF 1 and 2 expansions <br /> on Drawing A017. <br /> The demolished facilities have been removed from Drawing A017. <br /> 58. Drawing A011 Ore Stacking Plan and Drawing A018 VLF Cross Section Profiles depict <br /> Cross Section M which passes through VLF2 fully built out and stacked. The sight <br /> • indicator arrows of Cross Section M on A011 and the depicted Cross Section M on <br /> Drawing A018 do not match. Please correct orientation/direction of the sight indicator <br /> arrows of Cross Section M or how Cross Section M is drawn.Additionally, please correct <br /> the vertical existing ground feature near station 39+00 of Cross Section N on Drawing <br /> A018. <br /> The arrow direction on Drawing A011 for Section M has been corrected. The vertical existing ground <br /> feature near station 39+00 of Cross Section N on Drawing A018 has also been addressed. <br /> 59. Cross Sections P and Q on Drawing A011 Ore Stacking Plan and Drawing A019 VLF Cross <br /> Section Profiles have been switched. Please correct Cross Sections P and Q. <br /> The section callout has been corrected on A011. <br /> 60. Drawing A020 Leak Detection Details contains a Detail D—Typical Solid HDPE to <br /> Perforated CPe Pipe Connection with a drawing reference of Drawing A008. There is no <br /> call out for D/A020 on Drawing A008. Potentially this is meant for Drawing A012, however <br /> no D callout is on this drawing either. Please correct this accordingly. <br /> Section D was added to Drawing A012 and the reference on A020 has been corrected. Section D was <br /> also added to Drawings A014 and A016. <br /> 61. Drawing A028 Infiltration Gallery Plan shows a solid line for a 12" pipe located in VLF 2 <br /> Phase 4 Stage A area. The legend shows the 12" pipe as a dash-dot line instead of solid. <br /> Please explain if the 12" pipe in VLF 2 Phase 4 Stage A is perforated and if so, update the <br /> Drawing, otherwise the legend may need to be revised to reflect this different pipe type. <br /> • The line type generation of the perforated pipe has been corrected. <br /> SSR Mining Inc. PAGE 15/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.