My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-17_REVISION - M2020022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2020022
>
2025-06-17_REVISION - M2020022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 9:34:01 AM
Creation date
6/17/2025 10:16:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020022
IBM Index Class Name
Revision
Doc Date
6/17/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Austin & Betsy Clennin
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: 3H:1V 400 foot long 35 ft highwall <br /> Site: Becker Pit Permit Action: 2025 Inspection Permit/Job#: M2020022 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 5/23/2025 County: Huerfano Filename: 1 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper own.Cost/Hour: $14.53 NA <br /> Ripper op.Cost/Hour: $1.99 25 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $338.13 <br /> Total Fleet Cost/Hour: $338.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 4,785 <br /> Swell factor: 1.215 <br /> Loose volume: 5,814 LCY <br /> Source of estimated volume: Mining Plan <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 70 feet <br /> Unadjusted hourly production: 1,093.7 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -5% <br /> Average site altitude: 6,520 feet <br /> Material weight: 3,3001bs/LCY <br /> Weight description: Decomposed rock-75%Rock,25%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.