My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-17_REVISION - M2020022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2020022
>
2025-06-17_REVISION - M2020022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 9:34:01 AM
Creation date
6/17/2025 10:16:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020022
IBM Index Class Name
Revision
Doc Date
6/17/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Austin & Betsy Clennin
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2025 Reclamation Cost Estimate <br /> Site: Becker Pit Permit Action: 2025 Inspection Permit/Job#: M2020022 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/23/2025 County: Huerfano Filename: M022-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 31-1:1 V 400 foot long 35 ft hi hwall DOZER 1 11.31 $3,823 <br /> 002 Spread 8 inches of topsoil over 9.33 acres DOZER 1 15.72 $5,316 <br /> 003 Convert 21-1:1V slopes to 31-1:1V DOZER 1 3.57 $1,208 <br /> 004 Ve etation over 9.3 acres REVEGE 1 9.00 $6,908 <br /> 005 Mobilization MOBILIZE 1 3.38 $4,337 <br /> SUBTOTALS: 42.98 $21,592 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $436 <br /> Performance bond: 1.05 Total= $227 <br /> Job superintendent: 21.49 Total= $1,704 <br /> Profit: 10.00 Total= $2,159 <br /> TOTAL O&P= $4,526 <br /> CONTRACT AMOUNT(direct+O&P)= $26,118 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,110 <br /> Reclamation management and/or administration: 5.00 $1,306 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $7,441 <br /> TOTAL BOND AMOUNT(direct+indirect)= $29,033 <br />
The URL can be used to link to this page
Your browser does not support the video tag.