Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: King I&II-mobilize for rill and gully maintenance,X 3 <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 051 State: Colorado Abbreviation: None <br /> Date: 4/24/2025 County: La Plata Filename: C035-051 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $10.44 $22.18 $23.94 <br /> Operating Cost/Hour: $26.48 $54.55 $55.65 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $59.44 $122.78 $125.64 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D3K LGP-3P 9.20 $31.95 $59.44 3 $274.17 $178.32 $0.00 <br /> CAT 12M 16.01 $69.16 $59.44 3 $385.80 $178.32 $0.00 <br /> Subtotals: 1 $659.97 $356.64 $0.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total CosVhr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,2,500 Gal. $34.10 3 $102.30 $102.30 <br /> Subtotals: $102.30 $102.30 <br /> CIRCES Cost Estimating Software <br />