Laserfiche WebLink
Mobilization Worksheet Cont'd Task#050 Page 3 of 3 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DURANGO <br /> Total one-way travel distance: 20.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $12,206.02 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost* <br /> **one round trip,no haul rig: $250.34 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.50 0.50 <br /> Return Time(Hours): 0.50 0.50 <br /> Loading Time(Hours): 2.00 NA <br /> Unloading Time(Hours): 1.00 NA <br /> Subtotals: 4.00 1.00 <br /> JOB TIME AND COST <br /> Total job time: 8.00 Hours <br /> Total job cost: $12,456 <br /> CIRCES Cost Estimating Software <br />