Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: King II-distribute tosoil from Cochrane stockpile <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 401 State: Colorado Abbreviation: None <br /> Date: 5/l/2025 County: La Plata Filename: C035-401 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 12-18 c ,6x4 <br /> -Loader: CAT 938H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: CAT 938H <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA 100 NA NA <br /> Ownership cost/hour: $27.14 $32.87 NA $32.87 NA NA <br /> Operating cost/hour: $62.81 $31.02 NA $31.02 NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA $0.00 NA NA <br /> Ripper op.cost/hour: NA $0.00 NA $0.00 NA NA <br /> Operator cost/hour: $25.24 $36.85 NA $36.85 NA NA <br /> Unit Subtotals: $115.19 $100.74 NA $100.74 NA NA <br /> Number of Units: 2 1 0 1 0 0 <br /> Group Subtotals: Work: $331.12 Support: $100.74 Maint: $0.00 <br /> Total work team cost/hour: $431.86 <br /> MATERIAL QUANTITIES <br /> Initial volume: 27,699 CCY Swell factor: 1.215 <br /> Loose volume: 33,654 LCY <br /> Source of estimated volume: 22.36 ac- 1.5 ponds <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 50,300 Pounds <br /> CIRCES Cost Estimating Software <br />