My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-21_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2025-05-21_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 10:10:55 AM
Creation date
5/27/2025 10:08:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
5/21/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
GCC Energy, LLC
Type & Sequence
MT9
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISCELLANEOUS TRUCK WORK <br /> Task description: Water truck for dust control <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 314 State: Colorado Abbreviation: None <br /> Date: 5/1/2025 County: La Plata Filename: C035-314 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Make and Model: Water Tanker,2,500 Gal. Horsepower: 150 <br /> Attachment 1: Shift Basis: 1 per day <br /> Attachment 2: Weight: 5.25 <br /> Labor Unit 1: Tanker Driver- 1 rear axle (US Tons) <br /> Labor Unit 2: <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $11.65 NA <br /> Operating Cost/Hour: $22.45 100 <br /> Operator Cost/Hour: $21.12 NA <br /> Total Unit Cost/Hour: $55.22 <br /> Total Fleet Cost/Hour: $55.22 <br /> JOB TIME AND COST <br /> Fleet size: 1 Truck(s) Total job time: 240.00 Hours <br /> Unit cost: $55.22 /Hour Total job cost: $13,253 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.