My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-14_REVISION - M2013064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2013064
>
2025-05-14_REVISION - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:09:45 AM
Creation date
5/14/2025 9:27:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
Revision
Doc Date
5/14/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Garrett C. Varra - Varra Companies, Inc.
Type & Sequence
SI1
Email Name
NCG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#003 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.80 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude:4630 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Firm,smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (°/u) (min) <br /> 1 600.00 -2.00 3.00 1.00 2952 0.37 <br /> Haul Time: 0.37 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (°/u) (min) <br /> 1 600.00 2.00 3.00 5.00 2795 0.38 <br /> Return Time: 0.38 minutes <br /> Total Scraper team cycle time: 2.15 minutes <br /> Adjusted for job conditions: 671.72 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,343.44 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,343.44 LCY/Hour <br /> Unadjusted unit production/hour: 809.30 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 7.33 Hours <br /> Unit cost: $1.258 /LCY Total job cost: $12,390 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.