My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-14_REVISION - M2013064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2013064
>
2025-05-14_REVISION - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:09:45 AM
Creation date
5/14/2025 9:27:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
Revision
Doc Date
5/14/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Garrett C. Varra - Varra Companies, Inc.
Type & Sequence
SI1
Email Name
NCG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#003 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil-12.21 Acres X 6"Depth <br /> Varra-Coulson Resource Permit Action: <br /> Site: Project 2025Inspection Permit/Job#: M2013064 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 3/6/2025 County: Weld Filename: M064-003 <br /> User: NCG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Descri tion <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 120M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui went Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 100 75 <br /> Ownership cosVhour: $329.66 NA NA NA $52.82 $11.65 <br /> Operating cosVhour: $347.48 NA NA NA $43.76 $16.84 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cosVhour: NA NA NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $57.52 NA NA NA $56.70 $38.91 <br /> Unit Subtotals: $734.66 NA NA NA $153.28 $67.40 <br /> Number of Units: 2 0 0 0 1 1 <br /> Group Subtotals: Work: $1,469.32 Support: $0.00 Maint: $220.68 <br /> Total work team cost/hour:$1,690.00 <br /> MATERIAL QUANTITIES <br /> Initial volume: 9,849 CCY Swell factor: 1.000 <br /> Loose volume: 9,849 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.