Laserfiche WebLink
Minor Revision 258 -MR-258 proposed disturbance for a light-use road along the west side of <br /> Taylor Creek. The revision was received on August 15,2024,deemed complete on August <br /> 15, 2024 and approved on August 16, 2024. +$8,710.00 <br /> Minor Revision 259 -MR-259 proposed to retain the Streeter Pond as a permanent impoundment at <br /> the request of the surface landowner. The revision was received on August 21,2024,deemed <br /> complete on August 26, 2024 and approved on August 28, 2024. <br /> Technical Revision 164-TR164 provides the as-built for the Upper and Lower Section 3 Ponds.The <br /> revision was received on September 19, 2024,deemed complete on September 20, 2024 and <br /> approved on November 1, 2024. <br /> Technical Revision 165 -TR165 proposed reduction of the permit boundary to remove the Streeter <br /> Ditch and Pond.The revision was received on December 12, 2024,deemed complete on <br /> December 20, 2024 and approved on March 3,2025. <br /> Technical Revision 166-TR166 proposes changes to the Colowyo's topsoil replacement and seeding <br /> plans. The revision was received on March 11,2025, deemed complete on March 12,2025 <br /> and approved on April 8,2025. <br /> Minor Revision 260-MR-260 provides an updated certificate of liability insurance for Colowyo. <br /> The revision was received on April 8, 2025,deemed complete on April 8, 2025 and <br /> approved on April 8, 2025. <br /> Minor Revision 261 -MR-261 updates the permit by removing references to Streeter Pond and the <br /> lower segment of Streeter Ditch which have been Phase III released and are now outside the <br /> mine permit boundary.The revision was received on April 9, 2025,deemed complete on <br /> April 9,2025, and approved on April 9, 2025. <br /> Section III - Status of Stipulations <br /> According to the Division's records,there are five outstanding stipulations attached to Permit No. <br /> C-1981-019. These stipulations are listed below. <br /> Stipulation 2 Prior to disturbing any lands in the Lower Wilson area,the Colowyo <br /> Coal Company shall provide the Division with a PERMIT revision <br /> containing a mine plan and a reclamation plan and any additional <br /> baseline monitoring information(surface water, ground water, soils, <br /> vegetation, etc.)requested by the Division. <br /> The approval of Permit Revision 02 is only an approval for disturbance <br /> in the South Taylor Pit(South Taylor Pit,West Valley Fill,East Valley <br /> Fill and associated structures). NO DISTURBANCE IS APPROVED <br /> FOR THE LOWER WILSON AREA WITH THE APPROVAL OF <br /> PERMIT REVISION 02. <br /> Stipulation 3 Prior to disturbing the Lower Wilson area the Colowyo Coal Company <br /> shall perform further archaeological investigations on seven areas <br /> identified as requiring more detailed study in the October 1984 report <br /> titled "Cultural Resources Investigations in the Danforth Hills Proposed <br /> Coal Lease Area;Moffat and Rio Blanco Counties,Colorado; <br /> Consolidation Coal Company. These areas are as follows: 5MF1652, <br /> Colowyo Mine Midterm Review No.8 <br /> Permit No.C-1981-019 May 5,2020 <br /> 7 <br />