Laserfiche WebLink
STATE OF OLOFADO <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 C O L O R A D O <br /> Phone:(303)866-3567 DIVISION o F <br /> RECLAMATION <br /> FAX:(303)832-8106 MINING <br /> DESIGNATED MINING SAFETY <br /> LIMITED IMPACT(110d)OPERATION <br /> RECLAMATION PERMIT APPLICATION PACKAGE <br /> APPLICABILITY: <br /> This application package is for a Designated Mining Operation(DMO)affecting less than 10 acres and extracting <br /> LESS than 70,000 tons of mineral, overburden or combination of the two per calendar year and uses or stores designated chemicals or <br /> acid-producing materials in its production process or has the potential to produce acid mine drainage. If you plan to conduct a mining operation <br /> which meets these criteria,please follow the instructions provided in this package,and Rules 1.4.1,1.4.2,6.0,7.0,and 8.0 in the Mineral Rules and <br /> Regulations,as required. Please see Rule 1.1(12)for the definition of"Designated Mining"operation. <br /> FILING REOUIREMENTS: <br /> The Mineral Rules and Regulations(the Mined Land Reclamation Act, Section 34-32-101,et se .C.R.S.,and 2 CCR 407-1)of the Colorado <br /> Mined Land Reclamation Board(the"Board")regulate the permitting,operational,and reclamation requirements for all non-coal mining operations <br /> in Colorado. It is your obligation to comply with the Act and Regulations. You are encouraged to obtain and review a copy of the Rules,available <br /> for$8.00 from the Division of Reclamation,Mining,and Safety(the"Office"). In order to submit your application properly,it is recommended <br /> that you review the Act,and; <br /> Rule 1.1 Definitions; <br /> Rule 1.4.1 General Provisions of the Application Review and Consideration Process; <br /> RECEIVED <br /> Rule 1.4.2 Specific Requirements for Limited Impact Designated Mining Operations; <br /> Rule 1.5 Fees; APR 2 4 2025 <br /> Rule 1.6 Public Notice Prnred jrec; DIVISION OF RECLAMATION <br /> MINING AND SAFTEY <br /> Rule 3.1 Reclamation Performance Standards; <br /> Rule 3.3.1 Operating without a Permit-Penalty; <br /> Rule 4 Performance Warranties and Financial Warranties; <br /> Rule 6 Permit Application Exhibit Requirements; <br /> Rule 6.2 General Requirements of Exhibits; <br /> Rule 6.3 Specific Permit Application Exhibit Requirements; <br /> Rule 6.4.20 Exhibit T-Environmental Protection Plan; <br /> Rule 6.5 Geotechnical Stability Exhibit; <br /> Rule 7 Designated Mining Operations;and, <br /> Rule 8 Emergency Response Plan for Designated Mining Operations <br /> Office of Office of <br /> Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />