Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better) <br />condition: <br />The road is a popular ATV road/trail. Water bars will be placed on sloped ground to <br />support erosion control. Water barriers will placed where needed to minimize <br />sediment. <br />7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br />seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br />mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br />land or State Land Board if on state land. <br />A. Plant name and seeding rate: <br />Plant Name Seeding Rate (PLS/Acre) <br />30% Ephraim Crested Wheatgrass 25 lbs <br />25% Sheep Fescue <br />20% Perennial Ry <br />15% Chewings Fescue <br />10% Canada Bluegrass <br />Form 2—Public File Page 10 of 14