My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-14_HYDROLOGY - M1992069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1992069
>
2025-04-14_HYDROLOGY - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:18:00 AM
Creation date
4/16/2025 10:37:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Hydrology
Doc Date
4/14/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP April 14, 2025 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, &t 6243 Page 14 of 37 <br /> Bucklen Equipment Company Lease <br /> The Applicant executed an agreement with Bucklen Equipment Co., Inc. for the lease of <br /> excess augmentation credits from the Bucklen Pit SWSP (WDID 0302538) during the period of <br /> April through October 2025. A copy of the lease, dated November 18, 2024, is attached. The <br /> excess augmentation credits will be generated from six (6) Greeley Irrigation Company <br /> shares owned by the Bucklen Equipment Co., Inc. The return flow obligations associated <br /> with the use of the six Bucklen GIC shares are counted as a depletion in and will be replaced <br /> under the Bucklen Pit SWSP. After use in the Bucklen Pit SWSP, the shares are projected to <br /> produce a total of 70.70 acre-feet of excess credits during the 2025 irrigation season. <br /> According to the agreement, Bucklen Equipment Co. will lease to Holcim as needed any <br /> excess augmentation credit available during the 2025 irrigation season for use. The Bucklen <br /> GIC shares will be delivered to the Cache la Poudre River at the 23rd Avenue and Fourth <br /> Street Return Station (WDID 0302318). <br /> City of Greeley Lease <br /> Holcim has entered into a water lease agreement with the City of Greeley under which <br /> Greeley will provide a total of 36 acre-feet of fully consumable water for replacement <br /> purposes in April and October 2025. A copy of the lease agreement, dated February 3, 2025, <br /> is attached. The water is discharged to the Cache la Poudre River from the City's wastewater <br /> treatment plant. <br /> St. Wain River <br /> Projected 2025 <br /> Replacement Source Yield Comments <br /> (acre-feet) <br /> City of Longmont Lease 50 Annual lease <br /> Lighthouse Cove Pond 10.80 1.5 shares Smith 6t Emmons Ditch and <br /> Recharge free river <br /> City of Longmont Lease <br /> Holcim has entered into a water lease agreement with the City of Longmont under which <br /> Longmont will provide up to 24 acre-feet annually of fully consumable water to offset <br /> depletions which may regularly occur during the mining of the Irwin-Thomas Pit. A copy of <br /> the lease agreement, dated March 4, 2025, is attached. Holcim has separately requested <br /> that the City of Longmont provide 26 acre-feet to offset depletions at Holcim's other sites. <br /> Deliveries under this lease are available from either the outfall of Longmont's municipal <br />
The URL can be used to link to this page
Your browser does not support the video tag.