My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-14_HYDROLOGY - M1992069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1992069
>
2025-04-14_HYDROLOGY - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:18:00 AM
Creation date
4/16/2025 10:37:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Hydrology
Doc Date
4/14/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP April 14, 2025 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, &t 6243 Page 13 of 37 <br /> The ditch-wide analysis decreed in case no. 1996CW658 determined the acreage irrigated <br /> with GIC water rights was 3,501 acres, or 6.74 acres per share. Of that amount, 2,098 acres <br /> were determined to have been dried up as a result of development ("dry-up pool"). The <br /> total required dry-up associated with the subject 3 shares is 20.22 acres. Of the 3 GIC <br /> shares, 1.5 shares were used to irrigate 2.15 acres identified as Farm E-73a, and the <br /> remaining 1.5 shares were used to irrigate 7.06 acres identified as Farm E-73b. The acreage <br /> historically irrigated by the subject shares is below the irrigated-acreage-per-share historical <br /> average of 6.74. As such, the Applicant may claim the remaining 11 .01 acres of required <br /> dry-up from the "dry-up pool". The subject farms are no longer irrigated. <br /> In paragraph 6.7.4. of the decree entered in case no. 1996CW658, future farm headgate <br /> deliveries of the 67.75 shares owned by Poudre Prairie Irrigation Company were limited to <br /> 1,712 acre-feet per year (25.26 acre-feet per share) and 12,631 acre-feet (186.43 acre-feet <br /> per share) in any consecutive 10 year period. For the purposes of this one-year SWSP, <br /> deliveries of GIC direct flow water associated with the 3 shares must be limited to a farm <br /> headgate delivery of 55.8 acre-feet (18.6 acre-feet per share). The historical return flows <br /> associated with the 3 shares that are the subject of this SWSP shall be maintained in <br /> accordance with the return flow factors identified in case no. 1996CW658. The return flow <br /> obligations will be accounted for and replaced under this SWSP. <br /> For the purposes of this SWSP, you have used a projected yield of 20.31 acre-feet of GIC <br /> direct flow water per share and 1.19 acre-feet of Fossil Creek Reservoir deliveries per share. <br /> These amounts are consistent with projected deliveries per share for Year One as described <br /> in paragraph 28 of the decree entered in case no. 2003CW348. Projected deliveries for Year <br /> One were calculated in accordance with paragraph 20.3.3 of the decree entered in case no. <br /> 2003CW99, and are based on 2002-2006 recorded deliveries. As specified in case no. <br /> 1996CW658, all GIC direct flow deliveries incur an immediate surface return flow obligation <br /> of 23.7%, and all Fossil Creek deliveries incur an immediate surface return flow obligation of <br /> 20.1%. The estimated consumptive use credit is therefore 15.50 acre-feet per share for GIC <br /> direct flow water, and 0.95 acre-feet per share for Fossil Creek Reservoir water. For the <br /> purposes of this SWSP, Holcim is assuming that the GIC's 60 preferred rights in Fossil Creek <br /> Reservoir will not be available to GIC during WY2025. Excluding the Fossil Creek Reservoir <br /> component of the GIC deliveries, the projected farm headgate delivery of the 3 shares will <br /> equal 60.93 acre-feet per year (3 shares x 20.31 acre-feet/share), with a return flow <br /> obligation of 27.60 acre-feet. The total consumptive use credit for the 3 shares is therefore <br /> projected to equal 33.33 acre-feet for 2025. <br /> The GIC shares will be delivered back to the river through the 23rd Avenue and Fourth Street <br /> Return Station. <br />
The URL can be used to link to this page
Your browser does not support the video tag.