My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-11_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2025-04-11_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:52:02 AM
Creation date
4/14/2025 8:31:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/11/2025
Doc Name Note
Appendix D Thru Attachment E Binder 2 of 2
Doc Name
Request For Amendment To Permit
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
AM4
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Luis Permit Amendment M-1988-112 CDRMS <br /> Slurry Wall Battle Mountain Resources <br /> Table L-2: Remaining Acreage (BMRI, 2024) <br /> Item# Lists of Areas Acreage <br /> 4 West Pit 28.7 <br /> 3 Borrow Area 5.5 <br /> 3 Road Around Tailings 4 <br /> Facility and Collection Pond <br /> 3 Tailings Facility Perimeter 12.9 <br /> Road <br /> 1 Tailing Facility 22,6 _ <br /> 1, 2 Tailings Collection Pond 5 <br /> Total 78.7 <br /> 2.1 Water Treatment Plant <br /> The cost to run the San Luis WTP has historically been $1,000,000 per year. Therefore, we <br /> propose that the financial warranty will include 3 years of water treatment operations. The cost <br /> estimate is assumed to include all costs associated with operations,personnel, and site monitoring <br /> activities. <br /> 2.2 Overhead and Profit <br /> Overhead and profit have been historically included in financial warranty calculations and have <br /> been included here. Overhead and profit is 13.1%. <br /> 3.0 CONCLUSION <br /> The previous financial warranty amount that was calculated in 2020 was $7,362,354. Seven years <br /> of water treatment was calculated to cost $4,031,832 in February 2000. <br /> The updated financial warranty calculation amount is estimated at $3,697,249.35 with 3 years of <br /> water treatment estimated to cost $3,000,000. <br /> Attachments: <br /> Additional Cost Breakdown Tables <br /> Table L-3 —A: Waste Rock Disposal Area Tasks <br /> Table L-4—B: Tailings Disposal Area Tasks <br /> Table L-5 —C: Mill Facilities Tasks <br /> Table L-6—D: Roads and Parking Areas Tasks <br /> Table L-7—E: Roads Maintenance Tasks <br /> Table L-8 —F: Seeding Costs Tasks <br /> Table L-9—G: West Pit Reclamation Tasks <br /> Table L-10—H: Monitoring Well Abandonment Tasks <br /> Table L-11 —I: Equipment Mob/Demob Tasks <br /> Table L-12—J: Current Approved Monitoring Requirements Tasks <br /> Table L-13 —K: Miscellaneous Costs Tasks <br /> Table L-14—Total Calculations <br /> Attachment L-1 —March 2000 Financial Warranty Requirement Re-evaluation <br /> April 2025 2 Engineering Analytics,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.