My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-24_REVISION - P2007057
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2007057
>
2025-03-24_REVISION - P2007057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:04:34 AM
Creation date
3/24/2025 9:27:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007057
IBM Index Class Name
Revision
Doc Date
3/24/2025
Doc Name
Request For Modification
From
Nuvemco, LLC
To
DRMS
Type & Sequence
MD2
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Drill sites, sumps, sampling and removal will not involve constructing any new <br /> disturbance. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Upon completion of drilling hole MW1 and hole MW2 these two (2) drills holes will <br /> allow Nuvemco to comply with the Colorado Division of Reclamation, Mining and <br /> . . <br /> Reclamation Board for Hard Rock, Metal and Designated Mining Operations in securing <br /> a Designated Mine Operation (DMO) 1128. The proper paperwork and applications will <br /> be filed with Colorado Division of Water Resources - Department Natural Resources, <br /> and UKMS. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Reclamation will be completed to the standards described in 43 CFR 3809.420. <br /> are limited by the time of year during which they can be effectively implemented. Site <br /> conditions or yearly climatic variations may rcquirc that this schcdulc be modificd to <br /> achieve re-vegetation success. <br /> Drill sites constructed on existing roads will be reclaimed to the pre-Project condition. <br /> Ali spo piles from sump construction will be stockpiled on the existing waste dump. <br /> Form 2—Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.