Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br /> condition: <br /> Reclamation will be completed to the standards described in 43 CFR 3809.420. <br /> Reclamation activities will be completed by the spring of 2027. Re-vegetation activities <br /> are limited by the time of year during which they can be effectively implemented. Site <br /> conditions or yearly climatic variations may require that this schedule be modified to <br /> achieve re-vegetation success. <br /> Drill sites constructed on existing roads will be reclaimed to the pre-Project condition. <br /> All spoil pilcs from sump construction will be stockpilcd on the cxisting waste dump. <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> Galleta 2.47 <br /> Winterfat 0.25 <br /> Four-wing saltbrush 0.25 <br /> Indian ricegrass 3.71 <br /> Blue gamma 0.48 <br /> Salina Wildrye 1 .03 <br /> Needle and Thread 2.60 <br /> Western wheat grass 2.50 <br /> Form 2—Public File Page 10 of 14 <br />