Laserfiche WebLink
GENERAL EDITS &CONSISTENCY <br /> • "Wash-Plant"to"Screening Plant":Updated all references to avoid any impression of water usage in mineral <br /> processing. <br /> • Mining vs.Reclamation Timelines:Refined descriptions of phased disturbance and final reclamation to <br /> ensure clarity on concurrency,as requested. . <br /> • Updated Figures:Adjusted acreage references and cost estimates to be fully consistent with AR#1_CN2_ <br /> M2016081.pdf feedback. <br /> Additionally,we have enclosed signed map updates reflecting the changes outlined above.We are also providing <br /> digital GPS files of the revised permit boundary your for your reference and records and Revised Exhibit on USB <br /> stick.We believe these changes comprehensively address the Division's adequacy review questions. If you have <br /> further inquiries or need additional clarification,please contact me at(970) 306-1784 or by email at peter@aupt- <br /> industries.com. <br /> Thank you for your time and continued guidance. <br /> Sincerely, <br /> Peter Freedman <br /> Owner,AuPt Industries LLC <br /> P.O. Box 1424 <br /> Edwards,CO 81632 <br /> 970-306-1784 <br /> peter@aupt-industries.com <br /> i1 <br /> HARDROCK/METAL MINING REGULAR 11121 APPLICATION AuPt Industries LLC I PO Box 1424-Edwards Colorado 81632I 970 306 1784 <br />