Laserfiche WebLink
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Five groundwater monitoring wells will be installed. Approximately 0.2 acres (9,029 sq <br /> ft. ) disturbance will include 492 linear ft of road 12 ft wide and drill pads for 5 wells that <br /> , <br /> leaving the well collar and access road. Well construction will occur during daylight hours. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter,depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 4 Width (ft) 25 Length (ft) 25 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 5 Depth (ft) 250 (in) 6 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 0 Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type,quantity and general dimensions: <br /> Monitoring well construction is surface activity only. <br /> Form 2—Public File Page 6 of 14 <br />