Laserfiche WebLink
E. Other Disturbances (please describe) <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> No chemicals or fuels will be stored on site. <br /> G. New Roads: <br /> Length (ft): 492 Width (ft): 2 <br /> Significantly <br /> Upgraded Roads Length (ft): 0 Width (ft): 0 <br /> Are culverts or other crossings proposed? If so,please describe: <br /> Culverts are proposed for the access to the compliance well, MW-1 and MW-2. Culverts <br /> Will be 12 onch dmarneteF and will refneffin Eks long as well <br /> H. Total project area to be disturbed (acres) 0.2 acres <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Motor grader, bulldozer, loader, excavator and drill rig <br /> Form 2—Public File Page 7 of 14 <br />