Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02710 PIPING  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02710 Piping    Page 3  <br />3.2. Pipe Connections  <br />A. All connections for non‐perforated pipe shall be watertight under maximum anticipated  <br />pressure head.  <br />B. The ends of all pipe shall be capped with a manufactured pipe cap.  <br />C. HDPE pipe will be butt‐heat‐fusion welded in accordance with the MANUFACTURER's  <br />guidelines.  <br />D. CPe pipe joints shall conform to MANUFACTURER's recommendations.  <br />3.3. Bedding and Backfill  <br />A. CONTRACTOR shall place and compact Leak Detection Fill in accordance with Item 3.6.E  <br />of Section 02200.  <br />B. CONTRACTOR shall bed and backfill Leak Detection piping with Leak Detection Fill.  <br />C. Low Volume and High Volume Solution Collection pipe shall be placed on top of the  <br />geosynthetics, as shown on the DRAWINGS.  <br />D. Placement of Low Volume and High Volume Solution Collection and High Volume  <br />Solution Collection pipes shall be coordinated with other operations such as Low Volume  <br />Solution Collection Fill, Bedding Fill, Soil Liner, and Drain Cover fill placement. Equipment  <br />access directly on geosynthetics is expressly prohibited. Any damage to the  <br />geosynthetics caused by CONTRACTOR during pipe placement shall be repaired at the  <br />expense of CONTRACTOR.  <br />E. A minimum of 5 feet of Low Volume Solution Collection Fill and Drain Cover Fill shall be  <br />placed over the top of the pipe before crossing with rubber‐tired construction  <br />equipment. If pipe becomes crushed during or after installation by CONTRACTOR's  <br />equipment or methods of construction, the pipe shall be replaced by CONTRACTOR, at  <br />no additional cost to CC&V. The CONTRACTOR will be required to demonstrate to  <br />MANAGER that the equipment and procedures used are not detrimental to the piping,  <br />at no additional cost to CC&V.  <br />F. CONTRACTOR shall hold pipes in place with sand bags, or other methods approved by  <br />MANAGER, until the Low Volume Solution Collection Fill and Drain Cover Fill has been  <br />placed. Directly before placement of the Low Volume Solution Collection Fill and Drain  <br />Cover Fill, the sand bags will be removed.  <br />G. Secondary or tertiary High Volume Solution Collection pipes will be attached to the  <br />primary pipes with plastic ties or other method approved by MANAGER and CERTIFYING  <br />ENGINEER.