Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02710 PIPING  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02710 Piping    Page 2  <br />4. 15‐inch diameter "N‐12" perforated CPe pipe, as manufactured by Advanced  <br />Drainage Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER  <br />and CERTIFYING ENGINEER.    <br />5. 18‐inch diameter "N‐12" perforated CPe pipe, as manufactured by Advanced  <br />Drainage Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER  <br />and CERTIFYING ENGINEER.  <br />6. 24‐inch diameter "N‐12" perforated CPe pipe, as manufactured by Advanced  <br />Drainage Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER  <br />and CERTIFYING ENGINEER.  <br />7. 28‐inch diameter solid SDR 11 HDPE pipe, as manufactured by DRISCOPIPE or an  <br />equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />B. Leak Detection Pipe:  <br />1. 4‐inch diameter, "Highway‐Grade" perforated CPe pipe, as manufactured by  <br />Advanced Drainage Systems, Inc., or an equivalent approved by  MANAGER,  DESIGN  <br />ENGINEER and CERTIFYING ENGINEER.  <br />2. 4‐inch diameter, solid SDR 13.5 HDPE pipe or an equivalent approved by MANAGER,  <br />DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />C. Low Volume Solution Collection Pipe:  <br />1. 18‐inch diameter solid SDR 11 HDPE pipe or an equivalent approved by MANAGER,  <br />DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />2. 4‐inch "Highway Grade" perforated corrugated polyethylene (CPe) pipe, as  <br />manufactured by Advanced Drainage Systems, Inc., or an equivalent approved  by   <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />3. PART 3:  EXECUTION  <br />3.1. Installation  <br />A. CONTRACTOR shall install pipe according to MANUFACTURER's recommendations.  <br />B. CONTRACTOR shall take all precautions necessary to not damage the pipe during material  <br />placement. CONTRACTOR may periodically be requested by MANAGER to verify that  <br />covered pipe has not been crushed. Costs associated with proving pipes have not been  <br />crushed shall be borne by CONTRACTOR.  <br />C. Piping shall be placed to the lines and elevations shown on the DRAWINGS, with no sags  <br />or humps, as approved by MANAGER and CERTIFYING ENGINEER.