Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 19  <br />density as determined by the Standard Proctor density test (ASTM D698), and a  <br />moisture content 3 percent below and 3 percent over the optimum moisture  <br />content.  <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12‐inch loose lifts. Pipe  <br />Bedding Material will be worked under pipe haunches by hand to provide uniform  <br />support of the CSP.  <br />4. Native material used for backfilling CSP excavation shall be placed in 12‐inch to 18‐ <br />inch loose lifts, and compacted by wheel rolling with light, rubber tired or other light  <br />compaction equipment, as approved by CERTIFYING ENGINEER.  <br />K. Granular Filter Material  <br />1. Granular Filter Material shall be placed beneath the Riprap as shown on the  <br />drawings.  <br />L. Bedding Fill  <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on  <br />the DRAWINGS.  <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the  <br />compacted lift thickness is a minimum of 12 inches. CONTRACTOR shall condition the  <br />Bedding Fill to allow a surface that does not cause rutting or other deleterious effects.  <br />The moisture content and density shall be uniform throughout the lift. If a lift of  <br />compacted Bedding Fill dries out during placement operations, CONTRACTOR shall  <br />scarify, moisture condition the dry soil and recompact the lift. If a lift of compacted  <br />Bedding Fill becomes overly wet due to precipitation or over watering, CONTRACTOR  <br />shall allow the wet soil to dry to the specified moisture content range before re‐ <br />compaction of fill and placement of geosynthetic materials.  <br />3. CONTRACTOR shall assist CQA MONITOR in obtaining soil samples for CQA testing.  <br />Bedding Fill sampling shall be scheduled by CQA MONITOR with CONTRACTOR to  <br />facilitate CQA field testing.  <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown  <br />on the DRAWINGS.  <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to  <br />remove ridges and surface irregularities greater than 0.5 inches in height.  <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place  <br />geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt  <br />methods as necessary to obtain the same final surface preparations that would be  <br />obtained by the passage of a smooth‐drum roller on flat or level ground. Pushing of  <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts on  <br />the surface of the Bedding Fill from grading equipment shall be repaired by  <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as