My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 19 <br />density as determined by the Standard Proctor density test (ASTM D698), and a <br />moisture content 3 percent below and 3 percent over the optimum moisture <br />content. <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12‐inch loose lifts. Pipe <br />Bedding Material will be worked under pipe haunches by hand to provide uniform <br />support of the CSP. <br />4. Native material used for backfilling CSP excavation shall be placed in 12‐inch to 18‐ <br />inch loose lifts, and compacted by wheel rolling with light, rubber tired or other light <br />compaction equipment, as approved by CERTIFYING ENGINEER. <br />K. Granular Filter Material <br />1. Granular Filter Material shall be placed beneath the Riprap as shown on the <br />drawings. <br />L. Bedding Fill <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on <br />the DRAWINGS. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12 inches. CONTRACTOR shall condition the <br />Bedding Fill to allow a surface that does not cause rutting or other deleterious effects. <br />The moisture content and density shall be uniform throughout the lift. If a lift of <br />compacted Bedding Fill dries out during placement operations, CONTRACTOR shall <br />scarify, moisture condition the dry soil and recompact the lift. If a lift of compacted <br />Bedding Fill becomes overly wet due to precipitation or over watering, CONTRACTOR <br />shall allow the wet soil to dry to the specified moisture content range before re‐ <br />compaction of fill and placement of geosynthetic materials. <br />3. CONTRACTOR shall assist CQA MONITOR in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA MONITOR with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown <br />on the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0.5 inches in height. <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place <br />geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt <br />methods as necessary to obtain the same final surface preparations that would be <br />obtained by the passage of a smooth‐drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts on <br />the surface of the Bedding Fill from grading equipment shall be repaired by <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as
The URL can be used to link to this page
Your browser does not support the video tag.