Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 10  <br />9. After each layer of fill material has been placed, spread, and moisture‐conditioned,  <br />the layer shall be compacted by passing compaction equipment over the entire  <br />surface of the layer a sufficient number of times to obtain the required density, as  <br />specified herein. Compaction shall be accomplished with equipment and by methods  <br />approved by CERTIFYING ENGINEER. If such equipment or methods are found  <br />unsatisfactory for the intended use, CONTRACTOR shall replace the unsatisfactory  <br />equipment with other types or adjust methods until proper compaction is achieved.  <br />Prior to placement of a subsequent lift, the previous lift shall be thoroughly scarified  <br />to a nominal depth of 2‐inches to provide good bonding between lifts. Scarification  <br />shall be accomplished by disking, raking with a grader, or an alternative method  <br />approved by CERTIFYING ENGINEER.  <br />10. The CQA MONITOR will measure the ambient air temperature on an hourly basis. If  <br />the ambient air temperature is less than thirty‐two degrees Fahrenheit for more than  <br />one hour over the preceding twenty‐four (24) hours, the CQA MONITOR will  <br />measure the temperature of the fill to determine if the fill is frozen. "Frozen" is  <br />defined as a mean temperature of thirty‐two degrees Fahrenheit (32°F) or less. The  <br />CQA MONITOR will measure the temperature at a depth of three (3) inches and six  <br />(6) inches, recording the lower of the two. Six (6) measurements will be taken per  <br />acre, and if the average is below thirty‐two degrees Fahrenheit (32°F), the fill will be  <br />considered frozen. If the fill is determined to be frozen the CONTRACTOR may either  <br />remove and replace the frozen fill or wait until subsequent temperature monitoring  <br />indicates the fill is unfrozen at no cost to CC&V.  <br />11. Overburden slopes shall be compacted using a method specification and graded to  <br />meet the grades and dimensions shown on the DRAWINGS. The Bedding Fill subgrade  <br />surface will be prepared as identified in Section 2200 of the SPECIFICATIONS.  <br />B. Overburden Fill  <br />1. Areas to receive Overburden Fill will include, but are not limited to, backfilling existing  <br />pits to within 35 feet of the proposed geomembrane surface.  <br />2. Overburden Fill material shall be overburden waste placed with in maximum 25‐foot  <br />thick lifts, and compacted utilizing loaded haulage equipment.   <br />3. Maximum rock size for overburden fill shall be 5 feet.  <br />4. Prior to commencement of Overburden Fill, the CONTRACTOR shall complete task  <br />training to ensure that material meeting the specification is borrowed and placed.   <br />This training will include visually identifying oversized material and visually verifying  <br />that the material being loaded and placed is reasonably graded to avoid placement of  <br />gap graded material with excessive voids.   <br />  <br />