Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 9  <br />4. The distribution of materials shall be such that the fill is free from voids, lenses,  <br />pockets, streaks, or layers of material differing substantially in texture or gradation  <br />from the surrounding material. The material of a fill shall be as described in Section  <br />2.1 of this specification.  <br />5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the entire fill  <br />surface shall be at or near the same elevation at all times during construction. At all  <br />times during construction, the surface of the fill shall be graded and maintained by  <br />the CONTRACTOR to prevent ponding of water and to allow for storm water  <br />drainage.  <br />6. Except as otherwise specified or approved by MANAGER and CERTIFYING ENGINEER,  <br />the CONTRACTOR shall dump and spread fill in such a manner so that no excessive  <br />gaps are left between successively dumped loads of materials. The fill shall be leveled  <br />prior to compaction by means of a dozer or grader, or other suitable approved  <br />equipment, to obtain a surface free from depressions.  <br />7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where space is  <br />limited or otherwise specified, CONTRACTOR shall place fill by routing the hauling  <br />and spreading units approximately parallel to the axis of the fill. As far as practical,  <br />hauling units shall be so routed that they do not follow in the same paths, but split  <br />their tracks evenly across the surface of the fill to enhance compaction.  <br />8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in  <br />the borrow areas.    <br />CONTRACTOR shall maintain fill materials within the moisture content range  <br />required to permit proper compaction to the specified density with the equipment  <br />being used. The moisture content of the fill materials, prior to and during  <br />compaction, shall be uniform throughout each layer of the material.    <br />Prior to mixing of wet and dry material on the fill to obtain the proper moisture  <br />content, approval shall be obtained from CERTIFYING ENGINEER. Mixed material  <br />shall have a uniform distribution of the moisture content prior to placement on the  <br />subsequent lift.  <br />When materials spread on the fill are too dry for proper compaction, CONTRACTOR  <br />shall spray water on each layer of the fill and shall work the moisture into the fill by  <br />harrowing or other approved means, until a uniform distribution of moisture is  <br />obtained. Material that is too wet for proper compaction, as determined by  <br />CERTIFYING ENGINEER, shall be removed from the fill and/or spread out and  <br />permitted to dry, assisted by disking, and harrowing or mixing in dry material when  <br />permitted by CERTIFYING ENGINEER, if necessary, until the moisture content is  <br />reduced to an amount suitable for obtaining the specified degree of compaction, at  <br />no cost to CC&V.