My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewmontâCripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 9 <br />4. The distribution of materials shall be such that the fill is free from voids, lenses, <br />pockets, streaks, or layers of material differing substantially in texture or gradation <br />from the surrounding material. The material of a fill shall be as described in Section <br />2.1 of this specification. <br />5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the entire fill <br />surface shall be at or near the same elevation at all times during construction. At all <br />times during construction, the surface of the fill shall be graded and maintained by <br />the CONTRACTOR to prevent ponding of water and to allow for storm water <br />drainage. <br />6. Except as otherwise specified or approved by MANAGER and CERTIFYING ENGINEER, <br />the CONTRACTOR shall dump and spread fill in such a manner so that no excessive <br />gaps are left between successively dumped loads of materials. The fill shall be leveled <br />prior to compaction by means of a dozer or grader, or other suitable approved <br />equipment, to obtain a surface free from depressions. <br />7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where space is <br />limited or otherwise specified, CONTRACTOR shall place fill by routing the hauling <br />and spreading units approximately parallel to the axis of the fill. As far as practical, <br />hauling units shall be so routed that they do not follow in the same paths, but split <br />their tracks evenly across the surface of the fill to enhance compaction. <br />8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in <br />the borrow areas. <br />CONTRACTOR shall maintain fill materials within the moisture content range <br />required to permit proper compaction to the specified density with the equipment <br />being used. The moisture content of the fill materials, prior to and during <br />compaction, shall be uniform throughout each layer of the material. <br />Prior to mixing of wet and dry material on the fill to obtain the proper moisture <br />content, approval shall be obtained from CERTIFYING ENGINEER. Mixed material <br />shall have a uniform distribution of the moisture content prior to placement on the <br />subsequent lift. <br />When materials spread on the fill are too dry for proper compaction, CONTRACTOR <br />shall spray water on each layer of the fill and shall work the moisture into the fill by <br />harrowing or other approved means, until a uniform distribution of moisture is <br />obtained. Material that is too wet for proper compaction, as determined by <br />CERTIFYING ENGINEER, shall be removed from the fill and/or spread out and <br />permitted to dry, assisted by disking, and harrowing or mixing in dry material when <br />permitted by CERTIFYING ENGINEER, if necessary, until the moisture content is <br />reduced to an amount suitable for obtaining the specified degree of compaction, at <br />no cost to CC&V.
The URL can be used to link to this page
Your browser does not support the video tag.