Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 1  <br />SECTION 01400‐2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN  <br />1. PART 1:  INTRODUCTION  <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of  <br />the geosynthetic components used for the construction of the valley leach facility at the  <br />Cresson Project, Teller County, Colorado. This program has been developed to assure that  <br />the construction of the geosynthetic components are in compliance with the project  <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are  <br />achieved.  <br />The objective of this plan is to assure that proper materials, construction techniques, and  <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. This  <br />program also intends to identify problems that may occur during construction and provide the  <br />means for resolution of these problems.  <br />This program addresses quality assurance, not quality control. This CQA Plan is  <br />independent of the quality control (QC) programs conducted by the MANUFACTURERS,  <br />INSTALLERS, and CONTRACTORS. The intent of the CQA Plan is to provide independent third  <br />party verification and testing, to demonstrate that the INSTALLER and CONTRACTORS have  <br />met their obligations in the supply and installation of geosynthetic materials according to the  <br />design, project SPECIFICATIONS, contractual and regulatory requirements. Quality control is  <br />provided by the MANUFACTURERS, INSTALLERS, and CONTRACTORS and refers to those  <br />actions taken by them to ensure that their materials and workmanship meet the  <br />requirements of the plans and project SPECIFICATIONS.  <br />2. PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE  <br />The following section provides descriptions of the parties to this CQA plan including their  <br />responsibilities and qualifications.  <br />2.1. CC&V  <br />In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V  <br />owns and operates the valley leach facility.  <br />2.2. Manager  <br />In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple  <br />Creek & Victor Gold Mining Company. The MANAGER is the official representative of CC&V  <br />responsible for all construction activities including oversight and direction during construction.