My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400-1 EARTHWORK CQA – Owner Perform Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br /> <br /> <br /> <br />Technical Specification No. 01400-1 Earthwork CQA – Owner Performed Work Page 8 <br />7.1. Daily Record Keeping <br />Daily records kept shall consist of field notes, observation and testing data sheets, summary of <br />the daily meeting and reporting of construction problems and resolutions. The <br />CONTRACTOR/CQA MONITOR shall submit this information on a regular basis to MANAGER for <br />review. <br />7.2. Soils Observation and Testing Forms <br />The CONTRACTOR/CQA MONITOR will document soils observations on forms that generally <br />include the following information: <br /> date, project name, location, and weather data, including high and low daily temperatures; <br /> a site plan showing work areas and test locations; <br /> descriptions of ongoing construction detailing work areas and equipment utilized by <br />CONTRACTOR; <br /> summary of test results and samples obtained, with locations and elevations (Structural Fill <br />only); <br /> resolutions of deficient test results; <br /> test equipment calibrations, if necessary; <br /> summary of meetings held; and <br /> signature or initials of the CONTRACTOR/CQA MONITOR. <br />7.3. Photo Documentation <br />The CONTRACTOR/CQA MONITOR shall photograph all phases of construction. Photographs <br />shall be identified by location, time, date, and name of the CQA MONITOR taking the photograph. <br />7.4. Design and Specification Changes <br />During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CONTRACTOR/CQA MONITOR shall notify MANAGER, <br />which shall notify the DESIGN ENGINEER and the CERTIFYING ENGINEER. DESIGN and <br />SPECIFICATION changes shall only be made with written agreement from MANAGER and DESIGN <br />ENGINEER.
The URL can be used to link to this page
Your browser does not support the video tag.