My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400-1 EARTHWORK CQA – Owner Perform Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br /> <br /> <br /> <br />Technical Specification No. 01400-1 Earthwork CQA – Owner Performed Work Page 7 <br />Bedding Material and Granular Filter Material), if stockpiling is necessary; <br /> stockpiling activities to verify location of stockpile, material type, and dressing; <br /> excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage; <br /> subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br />otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br />materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br />in accordance with the SPECIFICATIONS; and <br /> construction of access roads, drainage control features and erosion control features to verify <br />compliance with the DRAWINGS and SPECIFICATIONS. <br />6.3.2. Placement Of Materials <br />6.3.2.1. Overburden Material <br />During placement of Overburden fill, the CONTRACTOR shall: <br /> verify the use of appropriate fills; <br /> monitor and document material placement, including soil type, particle size, loose lift <br />thickness, is in compliance with the SPECIFICATIONS; <br />6.3.2.2. Structural Fill <br />During placement of Structural Fill, the CQA MONITOR shall: <br /> verify the use of appropriate fills; <br /> monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to attain <br />compaction, including number of passes, uniformity of compaction coverage, compacted lift <br />thickness, bonding of lifts and in-place moisture content and dry density is in compliance with <br />the SPECIFICATIONS; <br /> monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />7. PART 7: DOCUMENTATION <br />Documentation kept by the CONTRACTOR/CQA MONITOR shall consist of daily record-keeping, <br />construction problem resolutions, design and SPECIFICATION changes, photographic records of <br />construction, weekly progress reports, chain of custody forms for test sample tracking, and a <br />Construction Certification Report.
The URL can be used to link to this page
Your browser does not support the video tag.