My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400-1 EARTHWORK CQA – Owner Perform Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br />Technical Specification No. 01400-1 Earthwork CQA – Owner Performed Work Page 4 <br />as unsatisfactory test results, will be dealt with directly between the CQA MONITOR, and <br />CONTRACTOR. The CQA MONITOR will also discuss any deficiencies with the CERTIFYING <br />ENGINEER. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER, and/or <br />MANAGER that cannot be resolved among themselves, MANAGER shall present the matter to <br />CC&V with MANAGER related recommendations and CC&V shall decide the matter with such <br />decision being final. <br />4.PART 4: DEFICIENCIES <br />When deficiencies (items that do not meet SPECIFICATIONS or DRAWINGS) are discovered, the <br />CQA MONITOR will immediately determine the nature and extent of the problem and notify the <br />CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be <br />performed to define the extent of the deficient area. <br />CONTRACTOR shall correct the deficiency to the satisfaction of the CQA MONITOR. If <br />CONTRACTOR is unable to correct the problem, the CQA MONITOR will notify MANAGER and <br />CERTIFYING ENGINEER which will assist in problem resolution. If the solution involves a design <br />revision, the DESIGN ENGINEER shall also be contacted. <br />The CQA MONITOR shall retest and the MANAGER and CERTIFYING ENGINEER shall approve the <br />corrected deficiencies before any additional related work is performed by CONTRACTOR. All <br />retests and related documentation shall be recorded by the CQA MONITOR and included in the <br />Construction Certification Report. <br />5.PART 5: MEETINGS <br />This section identifies and describes the meetings to be held during the course of the <br />construction. Meetings shall be held in order to clearly define construction activities and goals in <br />order to facilitate construction. <br />5.1. Preconstruction Meeting <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. <br />MANAGER, DESIGN ENGINEER, CERTIFYING ENGINEER, CQA MONITOR, CONTRACTOR, and <br />others designated by MANAGER shall attend this meeting. The purpose of this meeting will be <br />to: <br />review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />define the responsibilities of each party; <br />define lines of communication and authority;
The URL can be used to link to this page
Your browser does not support the video tag.