My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400-1 EARTHWORK CQA – Owner Perform Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br />Technical Specification No. 01400-1 Earthwork CQA – Owner Performed Work Page 3 <br />2.5. Construction Quality Assurance Monitor <br />The CQA MONITOR is the firm or individual responsible for performing the CQA tasks outlined in <br />this CQA Plan. The CQA MONITOR is the official CQA representative of CC&V and has the <br />responsibility of overseeing the CQA aspects of the Work. In this CQA Plan the CQA MONITOR is <br />associated with the CERTIFYING ENGINEER and refers specifically to (To Be Determined). The <br />CQA MONITOR has the authority to stop any aspect of the Work that is not in compliance with <br />the CQA Plan. Work would then be resumed once corrective action has been approved by <br />MANAGER. The specific responsibilities of the CQA MONITOR include: <br />review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br />review all CONTRACTOR QC submittals and make appropriate recommendations; <br />obtain preconstruction and construction samples and perform material evaluation testing as <br />required; <br />monitor foundation preparation activities as discussed in Section 6.3.1 and material <br />placement as discussed in Section 6.3.2; <br />assure that testing equipment used and tests performed are conducted according to <br />SPECIFICATIONS and industry standards; <br />document and report test results to MANAGER; <br />report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />MONITOR, including design or SPECIFICATION changes; <br />prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, tests <br />results (both laboratory and field), professional certification that construction was completed <br />in accordance with the DRAWINGS and SPECIFICATIONS. The Construction Certification <br />Report will be signed and sealed by the CERTIFYING ENGINEER registered in the State of <br />Colorado; <br />monitor the ambient air temperature and fill temperature, as outlined in Section 2200 of the <br />SPECIFICATIONS; and <br />maintain an on-site soils laboratory and perform regular calibration of equipment. <br />2.6. Earthworks Contractor <br />The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper <br />processing, delivery and placement of all components as outlined in the SPECIFICATIONS. <br />3.PART 3: LINES OF COMMUNICATION <br />The CQA MONITOR shall be capable of direct communication with MANAGER, DESIGN <br />ENGINEER and CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, such
The URL can be used to link to this page
Your browser does not support the video tag.