Laserfiche WebLink
Table 6Cripple Creek and Victor Gold Mining Company Valley Leach Facility 2Phase 3 Stage B Subgrade and Leak Detection Record of ConstructionCQA Earthworks Testing Summary - Leak Detection Fill1.0" 0.75" 0.5" 0.375" #4 #10 #16 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE Trench No.Station100 - - 40-70 5-50 - - 0-20 - - 0-10--NPLDF-1-R 5/4/2023 B 1 4+25 Top of Pipe-100 95.1 70.1 63.1 49 35.4 28.7 18.5 15.1 9.8 6.7GW-GM NP NV NPLDF-2-R 6/12/2023 B 2 1+75 Top of Pipe -100 96.7 71.8 61.8 48.8 33.8 27.4 17.7 14.6 9.5 6.6GW-GM NP NV NP1. Samples with a Plasticity Index less than 5 are reported as Non PlasticUSCSATTERBERG LIMITSSPECIFICATION - PERCENT PASSING SPECIFICATIONNotes:SAMPLE NUMBERDATE SAMPLEDLOCATIONELEVATION (FT)NATURAL MOISTURE (%)GRAIN SIZE DISTRIBUTION - PERCENT PASSINGR - Record Sample; NT - Not TestedNP - Non Plastic; NV - No ValuePage 3 of 3