Laserfiche WebLink
Table 5Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2Phase 3 Stage BSubgrade and Leak Setection Record of ConstructionCQA Earthworks Testing Summary -Contractor Placed Structural Fill24.0" 12" 8" 4.0" 3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #16 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXNORTHING EASTING100-40-100--------------0-25- - 30 MAX.SF-1-R 06/13/24 57,690.038,20010,260.0 100 94.2 89.6 79.8 71.5 63.9 56.9 50.2 44.439.7 35.1 28.4 23.5 19 13.5 10.8 9.6 9.5 GM NP NVNPSF-2-R 06/25/24 58,995.037,58510,190.0 100 100 96.8 80.6 72.9 65.8 60.3 56.8 52.4 46.141.8 34.8 28.3 24.7 18.5 15.6 10.5 8.6 GW-GM NP NV NPSAMPLE NUMBERDATE SAMPLEDSPECIFICATIONATTERBERG LIMITSSPECIFICATION - PERCENT PASSINGUSCS GRAIN SIZE DISTRIBUTION - PERCENT PASSINGELEVATION (FT)1. Samples with a Plasticty Index of less than 5 are reported as Non Plastic.Notes:R - Record Sample; BFG - Below Finished GradeNP - Non Plastic; NV - No ValuePage 2 of 3