Laserfiche WebLink
MATERIAL QUANTITIES <br /> Initial Volume: 1,923 <br /> Swell factor: 1.115 <br /> Loose volume:2,144 LCY <br /> Source of estimated volume: 10"dg2th over 1.43 ac above water <br /> Source of estimated swell factor:Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance:300 feet <br /> Unadjusted hourly production:291.4 LCY/hr <br /> Materials consistency description:Loose stockpile 1.2 <br /> Average push gradient:0% <br /> Average site altitude:4.670 feet <br /> Material weight:2,100 lbs/LCY <br /> Weight description:Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill:0.750(AVG.) <br /> Material consistency: 1.200(CAT HB) <br /> Dozing method: 1.000(GEN.) <br /> Visibility: 1.000(AVG.) <br /> Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Job efficiency:0.830(1 SHIFT/DAY) <br /> Spoil pile:0.800(FND-RF) <br /> Push gradient: 1.000(CAT HB) <br /> Altitude: 1.000(CAT HB) <br /> Material Weight: 1.095(CAT HB) <br /> Blade type: 1.000(PAT) <br /> Net correction:0.6544 <br /> Adjusted unit production: 190.69 LCY/hr <br /> Adjusted fleet production:381.38 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size:2 Dozer(s) <br /> Unit cost: $1.087/LCY <br /> Total job time:0 Hours <br /> Total job cost:IQ <br /> Page 1 of 2 <br /> REVEGETATION WORK <br /> Task description:Pit 1-Revee <br /> Site: Gunnison River Gravel Pits Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#:004 State:Colorado Abbreviation:None Date:5/1/2019 County:Mesa Filename:M048-004 User: <br /> ACY <br />