Laserfiche WebLink
Weight description:Gravel-Pitrun <br /> Job Condition Correction Factor Source <br /> Operator Skill:0.750(AVG.) <br /> Material consistency:0.900(CAT HB)) <br /> Dozing method: 1.000(GEN.) <br /> Visibility: 1.000(AVG.) <br /> Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Job efficiency:0.830(1 SHIFT/DAY) <br /> Spoil pile:0.800(FND-RF) <br /> Push gradient: 1.115(CAT HB) <br /> Altitude: 1.000(CAT HB) <br /> Material Weight:0.708(CAT HB) <br /> Blade type: 1.000(PAT) <br /> Net correction:0.3538 <br /> Adjusted unit production:274.83 LCY/hr <br /> Adjusted fleet production:549.66 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size:2 Dozer(s) <br /> Unit cost:$0.754/LCY <br /> Total job time:0 Hours <br /> Total job cost:0 <br /> Bulldozer Worksheet Cont'd Task#003 Page 1 of 2 BULLDOZER WORK <br /> Task description:Pit 1-Topsoil application Complete <br /> Site:Gunnison River Gravel Pits Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#:003 State:Colorado Abbreviation:None Date: 5/1/2019 County:Mesa Filename:M048-003 User: <br /> ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment:NA <br /> Shift Basis: 1 per day <br /> Data Source:(CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $93.62 NA <br /> Operating Cost/Hour: $73.35 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour:$0.00 0 <br /> Operator Cost/Hour: $40.23 NA <br /> Total unit Cost/Hour: $207.20 <br /> Total Fleet Cost/flour:$414.41 <br />