Laserfiche WebLink
Operator Cost/Hour:$27.66 <br /> Helper Cost/flour: $25.39 <br /> Total Unit Cost/Hour:$125.45 <br /> NON ROADABLE E UIPMENT. <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Drill/Broadcast 25.00 $15.54 $88.67 1 $104.21 $88.67 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $8.33 $88.67 1 $97.00 $88.67 $250.00 <br /> (Bowie LD-90) <br /> Subtotals: <br /> $201.21 $177.34 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet <br /> Cost/hr/fleet <br /> Light Duty Pickup,4x4, 1 $76.10 1 $76.10 $76.10 <br /> T.Crew <br /> Subtotals: <br /> $76.10 CIRCES Cost Estimating <br /> Software <br /> Mobilization Worksheet Cont'd Task#009 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region:GRAND JUNCTION <br /> Total one-way travel distance: 12.00 miles <br /> Average Travel Speed:45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* <br /> `*two round trips with haul rig:$1,604.31 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig:$40.59 <br /> Transportation Cycle Time: <br /> Non <br /> Roadable Roadable <br /> Equipmen Equipmen <br /> t t <br /> Haul Time(Hours):0.27 0.27 <br /> Return Time(Hours):0.27 0.27 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours):0.50 NA <br /> Subtotals: 1.53 0.53 <br />