Laserfiche WebLink
**one round trip,no haul rig:$40.59 <br /> Transportation Cycle Time: <br /> Non <br /> Roadable Roadable <br /> Equipmen Equipmen <br /> t t <br /> Haul Time(Hours): 0.27 0.27 <br /> Return Time(Hours): 0.27 0.27 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours):0.50 NA <br /> Subtotals: 1.53 0.53 <br /> JOB TIME AND COST <br /> Total job time: 0 Hours <br /> Total job cost: <br /> EQUIPMENT MOBILIZATIONIDEMOBILIZATION <br /> Task description: Secondary Mob <br /> Site: Gunnison River Gravel Pits Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#: 009 State: Colorado Abbreviation:None Date: 5/1/2019 County:Mesa Filename:M048-009 User: <br /> ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description:GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, 400 <br /> HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 51+Tons <br /> 0-25 Tons 26-50 Tons <br /> $16.63 $18.37 <br /> $44.38 $46.13 <br /> $27.66 $27.66 <br /> $0.00 $25.39 <br /> $88.67 $117.55 <br /> Ownership Cost/Hour: $22.33 <br /> Operating Cost/Hour: $50.07 <br />