My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-14_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2025-01-14_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 12:30:48 PM
Creation date
1/14/2025 8:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
1/14/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes Substitute Water Supply Plan Renewal <br /> January 10, 2025 <br /> Page 11 of 14 <br /> modification by the Division Engineer. Accounting forms need to identify the WDID <br /> number for each structure operating under this SWSP. Additional information <br /> regarding accounting requirements can be found in the attached Augmentation Plan <br /> Accounting Protocol. NOTE: Monthly accounting, even during the winter non-irrigation <br /> season, is required. <br /> In addition, the Applicant shall verify that the entity making replacements has <br /> included the Applicant on their accounting and submitted their accounting to the <br /> division office and the Water Commissioner; for this SWSP, that entity is the City of <br /> Aurora. <br /> 15.Conveyance loss for delivery of augmentation water to the point of depletion on the <br /> South Platte River is subject to assessment and modification as determined by the <br /> Division Engineer. <br /> 16. In order to prevent injury to other water rights, the Division Engineer and Water <br /> Commissioner must be able to administer Applicant's replacement water past <br /> headgates on the river at times when those headgates would otherwise be legally <br /> entitled to divert all available flow in or "sweep" the South Platte or its tributaries. <br /> Applicant shall not receive credit for replacement of depletions to the South Platte <br /> below such diversion structures unless bypass and measurement structures are in <br /> place to allow the Division Engineer and Water Commissioner to confirm that <br /> Applicant's replacement water is delivered past the headgates. In the event that <br /> delivery past dry-up points requires the use of a structure for which a carriage or use <br /> agreement with a third party is required, Applicant shall be responsible for securing <br /> such agreement. Until such time as the Applicant provides a copy of the carriage or <br /> use agreement to the Division Engineer and Water Commissioner, no credit will be <br /> allowed for replacement of depletions to the South Platte below such diversion <br /> structure. The Division of Water Resources will not be responsible for any <br /> enforcement or administration of third party agreements that are not included in a <br /> decree of the water court. <br />
The URL can be used to link to this page
Your browser does not support the video tag.