My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-14_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2025-01-14_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 12:30:48 PM
Creation date
1/14/2025 8:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
1/14/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes Substitute Water Supply Plan Renewal <br /> January 10, 2025 <br /> Page 9 of 14 <br /> is received after the expiration date of this plan, it will be considered a request for a <br /> new SWSP and the $1,593 filing fee will apply. <br /> 2. Well permit no. 82252-F has been obtained for Stage 1, 2, 5, 6A, 613, 6C/6D, 7A and <br /> 7B of the Morton-Holton Lakes site and this permit remains valid. If uses not allowed <br /> by this permit are proposed as part of any SWSP renewal, a new well permit must be <br /> obtained in accordance with section 37-90-137(2), C.R.S., and an approved SWSP prior <br /> to commencing mining of that area. Any application will be evaluated subsequent to <br /> approval of this SWSP. The provisions of section 37-90-137(2), C.R.S., prohibit the <br /> issuance of a permit for a well to be located within 600 feet of any existing well, <br /> unless the State Engineer finds that circumstances so warrant after a hearing in <br /> accordance with the procedural rules in 2 CCR 402-5. The hearing will be waived if <br /> you are able to obtain statements from the owners of all wells within 600 feet, <br /> verifying that they have no objection to your use of the proposed well. <br /> 3. The total surface area of the groundwater exposed at the Morton-Holton Lakes site <br /> must not exceed 33.0 acres as shown on Table A above resulting in an evaporation loss <br /> of 96.31 acre-feet. Should the total surface area exposed exceed those amounts, an <br /> amendment request shall be promptly filed with this office. <br /> 4. The water used for dust control at the Morton-Holton Lakes site shall not exceed <br /> 10.20 acre-feet. <br /> 5. The total product mined at the Morton-Holton Lakes associated with a 2% depletion, <br /> as described above, shall not exceed 550,000 tons, resulting in a total depletion of <br /> 7.97 acre-feet. <br /> 6. The total water used for final construction of Stage 5 shall not exceed 67.02 acre- <br /> feet. <br /> 7. The total consumptive use under this SWSP shall not exceed 181.51 acre-feet and the <br /> total lagged depletions shall not exceed 182.90 acre-feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.