Proposed Decision and Findings of Compliance <br />Partial Phase I, II and III Bond Release SL-23 Page 8 of 16 <br />To further ensure accuracy, the Division recorded the elevation of a basepoint at the main office area of <br />Colowyo and compared this point to the elevational reading on the iPhone 13. The office basepoint was at <br />7240 ft. The surveying device recorded an elevation of 7270 at the same location. This provided a correction <br />factor of -30 ft for all data points recollected on November 20th. These corrected values are shown below in <br />Tables 1 – 3. Comparative analysis of this data reveals that the accuracy of elevational measurements was still <br />slightly compromised but was more accurate than initial readings. When compared to 2023 USGS LiDAR <br />elevational readings taken at the same GPS locations, elevational readings taken by the Division were on <br />average only 28 ft off from on the ground conditions (Table 3). The largest discrepancies were recorded along <br />the mid-section of Streeter Ditch, however the elevation point taken at Streeter Pond matched the approved <br />structure design. The Division considers the elevation reading discrepancies along the mid-section of the <br />Streeter Ditch anomalies due the surrounding steepness in terrain leading to limited GPS reception. Given the <br />expanse of the mine site and the steepness of the terrain at Colowyo, as well as the error contributed by limited <br />GPS reception, the Division has determined that the difference in elevation is acceptable for determination that <br />Streeter Ditch has met all requirements of Phase I release. <br /> <br />Streeter Ditch and Streeter Pond were also inspected to ensure that these areas were graded and blended in <br />with the adjacent reclaimed areas while retaining stability. During visual inspection of the Streeter Ditch, no <br />erosional issues were noted, and no areas were identified that would suggest stormwater would flow outside of <br />the approved channel area. Rip rap was in place and stable along the channel areas approved for such design <br />(Stations 0+00 to 45+00). From Stations 45+00 to 68+41, the channel shifts into a vegetated channel. Around <br />Station 40+00, the channel widens and has taken on a braided effect with smaller meandering channels which <br />have established within the larger channel itself (Figure 2, from DRMS inspection report dated 10/30/2024). <br />These meandering channels are not very deep or wide, have been at a stable size for many years based on <br />previous inspection reports, and are well within the width of the constructed ditch channel (Photos 9 and 10, <br />from DRMS inspection report dated 10/30/2024). The same pattern of steady state meander repeats from <br />approximately Station 62+00 to 67+00. No erosional issues were noted during the visual inspection and grading <br />and channel establishment has been constructed to encourage proper storm drainage as required through Streeter <br />Ditch. <br /> <br />At Streeter Pond, the primary spillway, riser, and trash rack were measured against the as-built design and <br />found to be constructed accordingly. The emergency spillway, at the southern end of the pond, was inspected <br />and found to be free of obstructions. The primary discharge point was found to be flowing and was also free of <br />obstructions. Although water discharges from this point, the Colorado Department of Public Health and <br />Environment, Water Quality Control Division, released Colowyo of monitoring requirements at the discharge <br />from Streeter Pond in 2017. Streeter Pond was found to be in compliance with the permanent impoundment <br />requirements and water quality standards specified under Rule 4.05.9(13)(a-f). At the request of the <br />landowner, the pond is approved as a permanent structure in support of the post-mining land use. The pond is <br />stable with vegetated embankments and remains functional. The Division reviewed previous inspections of the <br />Streeter Pond as part of the SL-23 process and the pond has had no items of concerns or previous issues. <br /> <br />For Streeter Ditch and Streeter Pond, the Division finds that the Colowyo Mine has achieved a post-mining <br />surface that conforms to the approved post-mining topography and resembles the general surface configuration <br />of the land prior to mining. All reclaimed lands blend in well with the adjacent reclaimed slopes. Both the <br />pond and ditch were observed to have achieved long term stability and are functioning effectively as a post- <br />mining drainage channel and permanent impoundment. <br /> <br />PHASE II <br /> <br />As per Rule 4.15.1(2)(b), vegetation cover shall be capable of stabilizing the soil surface to achieve erosion control <br />equal to pre-mining levels. As discussed earlier in this document, there are no topsoil or revegetation requirements <br />for permanent structures or ponds. Rule 3.03.1(3)(b) states that lands which to which the release would be