Laserfiche WebLink
Table 1 — Groundwater Sampling Location Data <br /> Location Surface Top of Total Depth to Completion <br /> ID Description Lat. Long Elev. Casing Elev. Depth (ft) Water(ft) Date <br /> GW-1* Eastern TBD TBD TBD TBD TBD TBD TBD <br /> corner of <br /> site <br /> GW-2* Western TBD TBD TBD TBD TBD TBD TBD <br /> edge of site <br /> (southern <br /> point) <br /> GW-3* Western TBD TBD TBD TBD TBD TBD TBD <br /> edge of site <br /> (northern <br /> point) <br /> *Monitoring wells to be constructed prior to the implementation of this plan.Location,casing,depth,etc.will <br /> be updated once construction is complete. <br /> North Hangs Mine GW Monitoring <br /> Plan 5 U Lewicki&Associates <br /> December 2024 <br />