My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-19_PERMIT FILE - M2024059 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024059
>
2024-12-19_PERMIT FILE - M2024059 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 8:40:22 AM
Creation date
12/23/2024 8:22:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024059
IBM Index Class Name
Permit File
Doc Date
12/19/2024
Doc Name
Application
From
Western Slope Materials
To
DRMS
Email Name
TJ1
THM
EL1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .2. Baseline Groundwater Characterization <br /> Water quality and quantity sampling will take place at three locations for five quarters prior to <br /> mining operations in order to establish the baseline groundwater characterization. Quality <br /> sampling will take place at the three groundwater wells (GW-1, GW-2, and GW-3) to define the <br /> baseline water quality for the entire site. Compliance monitoring will be taken downstream <br /> during mining at GW-2 or GW-3 throughout the life of the mine. All wells will be located outside <br /> of mining and wetlands. <br /> Each sample point can be seen on the map in Appendix 1 and on Figure 2. Details on the <br /> sampling locations are provided in Table 1. All locations will be constructed as new monitoring <br /> wells outside of the slurry wall. <br /> h ,� 4 +rx,i r '.411; +.;4,.q LEGEND <br /> ' � � :e Y r , art - <br /> : Permit Boundary <br /> `e� 7 '<.. Ca o ado RI Mining Boundaries <br /> t_> : Sampling Well Location <br /> s ,*fi , ' GW flow direction _ $ <br /> is,° '.1114i!GW-3:Constructit <br /> Monitoring Well "' K <br /> GW-1:Construct <br /> Monitoring Well <br /> e. -.a f <br /> A',- - <br /> .�;.. <br /> , a. <br /> # • <br /> t <br /> 4 <br /> r <br /> GW-2:Construct <br /> Monitoring Well <br /> y -r <br /> 'e <br /> J <br /> A <br /> Google Earth 1 ` N <br /> 1000 rt <br /> 1 <br /> *Groundwater flow direction needs to be confirmed with baseline water level monitoring. <br /> Figure 2— Groundwater Sampling Locations <br /> North Hangs Mine GW Monitoring <br /> Plan 4 III Lewicki&Associates <br /> December 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.