Measurement and Payment <br /> No measurement for payment shall be made for this item. Payment will be lump sum under ITEM <br /> 4.0 of the Bid Schedule and will be made upon completion of the item and approval by the <br /> PROJECT MANAGER. This price shall include all materials, labor, equipment, rentals, <br /> coordination time, and all other items necessary and incidental to complete the tasks described <br /> in ITEM 4.0. <br /> ITEM 5.0 CAMP TRAILER-ASBESTOS ABATEMENT AND REMOVAL <br /> The site includes a twelve-foot (12 ft.) by ten-foot (10 ft.) camp trailer. An asbestos survey was <br /> performed at the camp trailer located at the Black Rose mine on June 14, 2024. Eighteen (18) <br /> Bulk samples were collected from a camp trailer by Foothills Environmental, Inc. The results <br /> from the survey indicate that two (2) materials were identified as asbestos containing materials <br /> (ACM). (See attached Foothills report). Task 5.0 requires the abatement, removal and disposal <br /> of all asbestos containing material noted in the June 26t", 2024, Foothills report. <br /> The exterior caulk around the windows, doors, other exterior penetrations, roof hatch, siding <br /> edges trim, roof trim, etc. contain asbestos and will need to be abated before the trailer is <br /> demolished if the plan is to demo in place. The caulks are non-friable but would be rendered <br /> friable during demolition. The other option would be to wrap the trailer in plastic and remove it <br /> to the landfill intact. <br /> Following asbestos abatement, the camp trailer will be removed from the site to an <br /> authorized waste disposal facility. All asbestos noted in the Foothills report must be <br /> removed, or properly abated, prior to demolition in accordance with all Federal, State and <br /> County Rules and Regulations. Demolition must be in accordance with Colorado Department <br /> of Public Health and the Environment (CDPHE), Regulation 8. Disposal shall be in <br /> accordance with CDPHE Hazardous Materials and Waste Management Division regulations. If <br /> non-friable material is to be left in place during demolition, it shall not be subject to abrasion, <br /> grinding, sanding or any other process during demolition that will render the non-friable <br /> material friable. <br /> Asbestos permitting, removal, transport and disposal for all asbestos containing materials at <br /> the Black Rose Mine must be performed by a Colorado-certified General Abatement <br /> Contractor in accordance with all Federal, State and County Rules and Regulations. Any <br /> Federal, State (Colorado Department of Public Health and the Environment; CDPHE) or <br /> County permits required for the removal of the asbestos containing material is the <br /> responsibility of the CONTRACTOR. A copy of all documentation related to the permitting, <br /> abatement, transporting and disposal of asbestos containing material must be provided to the <br /> PROJECT MANAGER. CONTRACTOR MUST SUPPLY PROJECT MANAGER WITH A <br /> WRITTEN ABATEMENT PLAN PRIOR TO CONDUCTING AN ASBESTOS ABATEMENT. <br /> Any confirmation sampling of the materials noted in the Foothills report is the responsibility of <br /> the CONTRACTOR. <br /> Page 121 <br />