It is the responsibility of the CONTRACTOR to ensure that sediment generated during the <br /> construction and reclamation work process does not migrate from the construction area. In order <br /> to accomplish this, CONTRACTOR must take appropriate steps before and during construction <br /> to minimize sediment transport from the site. Pre-construction steps will include, at a minimum, <br /> Placing straw bales or silt fence below areas of operations so that all runoff from these areas is <br /> controlled prior to discharging from the site; <br /> ITEM 3.1 - Straw Wattles for Stormwater Controls <br /> Straw wattles will be installed along the lower access road to control sediment release to the <br /> adjacent ephemeral drainage. The PROJECT MANAGER will direct the specific locations and <br /> quantities of all straw wattles for installation. The CONTRACTOR will provide and install <br /> approximately one hundred linear feet (100 If) of straw wattles per manufacturer's <br /> specifications and per Standard Work Specification 22 from the General Bid Specifications, 2009 <br /> with the following modifications: <br /> Straw wattles will be eight to twelve inches (8"-12") in diameter <br /> The straw will be certified weed free <br /> The wattles must be placed four inches (4") into the ground and staked with twelve inch (12") <br /> long wooden stakes <br /> Measurement and Payment <br /> Payment for this task will be made at the unit price established in ITEM 3.1 of the Bid Schedule. <br /> Measurement for payment will be made per linear foot of installed straw wattles. Payment for <br /> this task will be upon completion of installation and upon approval of the PROJECT MANAGER. <br /> Such payment shall be considered full compensation for all labor, materials, equipment and all <br /> other items necessary and incidental to the completion of ITEM 3.1. <br /> ITEM 3.2 - Straw Bales for Stormwater Controls <br /> Provide and install erosion control bales per manufacturer's specifications and per Standard <br /> Work Specification 22.2 from the General Bid Specifications, 2009. The straw wattles will be <br /> installed in the ephemeral drainage below the tank removal area to control sediment release. <br /> The PROJECT MANAGER will direct the location and amount of all erosion control bales for <br /> installation. It is anticipated that as many as five (5) erosion control bales may be required. <br /> Acceptable bales MUST be certified as weed free. CONTRACTOR should anticipate removal <br /> and disposal of at least half of the straw bales installed. <br /> Measurement and Payment <br /> Payment for this task will be made at the unit price established in ITEM 3.2 of the Bid Schedule. <br /> Measurement for payment will be made per installed erosion control bale. Payment for this task <br /> will be upon completion of installation and upon approval of the PROJECT MANAGER. Such <br /> payment shall be considered full compensation for all labor, materials, equipment and all other <br /> items necessary and incidental to the completion of ITEM 3.2. <br /> Page 118 <br />