At a minimum, the plan MUST provide specific, detailed responses to the following list of safety <br /> concerns that are likely to present themselves during the course of Project completion. When <br /> developing the Project Safety Plan, please list specific types of equipment to be provided by <br /> CONTRACTOR, including subcontractor(s), in order to address the safety concern, or <br /> specifically state the actions to be taken by CONTRACTOR, including crew and subcontractor(s) <br /> order to address the safety concern. <br /> FIRE SAFETY- The site is remote and inaccessible. Fire safety is paramount durin_g the <br /> course of the project. TWO, twenty(20) pound Class A fire extinguishers, or equivalent, <br /> and a large round-pointed shovel with an overall length of at least forty-eight (48) inches <br /> will be required to be on site at all times. <br /> NOTE that the PROJECT MANAGER may suspend the work, either wholly or in part, for <br /> such period or periods as he /she may deem necessary, due to unsafe work practices. <br /> The job clock will NOT be stopped in such a circumstance. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this item will be reflected in a lump sum <br /> quote under Item 2.0 on the Bid Schedule. This lump sum quote will cover all costs for developing <br /> and implementing the Project Safety Plan or SHEAP, including writing and revising the plan as <br /> required, provision and maintenance of safety equipment, conduct of daily safety meetings and <br /> all other items necessary and incidental to meeting the specifications of this item and of the <br /> Project Safety Plan or SHEAP. Payment shall be made as this item is completed and approved <br /> by the PROJECT MANAGER. <br /> ITEM 3.0 STORMWATER AND EROSION CONTROL <br /> Stormwater and erosion controls will be utilized to prevent erosion. Best Management Practices <br /> (BMPs) shall be utilized to protect ephemeral drainages and to prevent offsite contamination. <br /> BMPs, such as straw wattles, erosion control bales, and silt fence, shall be installed at the work <br /> site to act as a secondary containment to collect offsite fluid flows or migration of sediment from <br /> construction activities. <br /> A variety of stormwater controls may be utilized, depending on the amount of minor access <br /> improvements, site topography and the extent of excavation. All stormwater controls must be <br /> directed and approved by the PROJECT MANAGER prior to implementation. It is the <br /> CONTRACTOR's responsibility to maintain all erosion control measures for the duration of the <br /> project. The separate Bid Items for straw wattles, straw bales, and silt fence are described in <br /> ITEMS 3.1, 3.2, and 3.3. <br /> Project work will not be allowed during heavy precipitation events, due to the potential for flash- <br /> flooding, erosion, and muddy conditions. The PROJECT MANAGER will notify the <br /> CONTRACTOR when work will be delayed due to weather. Significant weather delays will not <br /> be counted toward the time of completion clock. <br /> Page 117 <br />